← Back to all issues
Climatora Daily

Rooftop solar above 10 kW may need batteries

Issue 026 26 Nov 2026 19 stories · 5 min read

Today in 60 seconds

  • The Power Ministry's draft rules would require battery storage for rooftop solar above 10 kW and open the door to net metering charges.
  • Cleantech Solar signed an MoU with Tamil Nadu for 1.1 GW of solar, wind and storage for industrial buyers.
  • Maharashtra will fold check dams into every new bridge and give free foodgrains to 42.3 lakh drought-hit farmers.

Policy & Regulation 3

India

Draft Rules Propose Battery Mandate for Rooftop Solar Above 10 kW

The Ministry of Power has proposed amendments to the Electricity Rules that would make storage compulsory for rooftop systems above 10 kW. The draft also brings in Time of Day tariffs and possible net metering charges to shore up discom finances.

Why it matters: If adopted, payback periods for commercial and housing-society rooftops would lengthen, and building designers would need to plan space and budgets for batteries.

Read at The Hindu BusinessLine →
India

Uttar Pradesh Seeks ₹3,750 Crore for 750 MW of Home Rooftop Solar

Uttar Pradesh has asked the Centre to fund rooftop systems on another 5 lakh households under PM Surya Ghar: Muft Bijli Yojana, a proposal worth ₹3,750 crore for about 750 MW.

Why it matters: The proposal would make India's most populous state a far larger part of the national residential rooftop push.

Read at Mercom India →
International

COP31 Ends Without an Overall Agreement

The Antalya summit closed with no overarching deal, the first such outcome since 2009. Talks broke down over fossil fuel wording and an Australian-led proposal to make climate finance easier for vulnerable countries to reach.

Why it matters: India has tied its own ambition to finance flows from rich countries; a stalled process leaves that money no closer.

Read at Climate Home News →

Energy & Power 6

India

Cleantech Solar Signs 1.1 GW Clean Power MoU With Tamil Nadu

Cleantech Solar will develop 1.1 GW of solar, wind and battery storage capacity for commercial and industrial customers in Tamil Nadu over five years, with investment put at about ₹8,000 crore.

Why it matters: Corporate buyers in Tamil Nadu's manufacturing belt get a large new source of contracted green power for their Scope 2 targets.

Read at The Hindu BusinessLine →
India

L&T Wins Up to ₹2,500 Crore Khavda Battery Storage Order

Larsen & Toubro will build a 300 MW/900 MWh liquid-cooled battery system at Khavda in Gujarat, giving three hours of storage to the renewable park.

Why it matters: Khavda is India's flagship renewable hub, and storage at this scale decides how much of its output can be delivered after sunset.

Read at Business Standard →
India

NTPC Green Names Winners for 3.3 GWh Khavda Battery Auction

NTPC Green Energy has picked developers for 3,300 MWh of battery storage at Khavda, to be paired with NTPC Renewables' solar plants at the same site.

Why it matters: Together with L&T's order, this puts more than 4 GWh of storage into one Gujarat cluster.

Read at Mercom India →
India

Noida Discom Awards 300 MW Round-the-Clock Power at ₹4.43–4.44/kWh

Noida Power Company awarded 85 MW to ReNew at ₹4.43/kWh and 215 MW to Purvah Green Power at ₹4.44/kWh for projects combining solar, wind and storage.

Why it matters: Firm renewable power at about ₹4.4/kWh gives other discoms a reference price when weighing it against new thermal contracts.

Read at PV Magazine India →
India

SJVN Picks Winners for 2 GW of Pumped Storage

SJVN has finalised the winning bidders in its auction for 2,000 MW of pumped storage projects, a tender first floated in December last year.

Why it matters: Pumped hydro offers longer-duration storage than today's batteries, which India needs as solar's share of the grid rises.

Read at Mercom India →
India

Bihar Tenders AgriPV Plants to Solarise Farm Feeders

Bihar's state generation company wants bids for grid-connected solar plants on agricultural feeders, built as AgriPV systems that must keep at least 80% of normal crop yield.

Why it matters: The 80% yield rule tests whether solar and farming can share land in a state where farmland is scarce.

Read at Saur Energy →

Water & Climate Impacts 3

India

Maharashtra Makes Check Dams Mandatory on New Bridges

Every new bridge in Maharashtra will now include a check dam to hold water. The state is also giving free foodgrains to 42.3 lakh farmers in 33 drought-hit districts.

Why it matters: Building water storage into routine road infrastructure is a low-cost adaptation model other drought-prone states could copy.

Read at Free Press Journal →
India

Sugar Output Seen Falling to 26.5 Million Tonnes on Erratic Weather

ISMA expects net sugar production of 26.5 million tonnes in 2026-27, citing a 3.2% drop in cane area plus flooding and moisture stress in key growing states.

Why it matters: Less cane means less feedstock for ethanol, putting pressure on India's fuel blending targets as well as food prices.

Read at Mint →
India

ICAR Institute Patents Biodegradable Seed Coating for Dry Spells

ICAR-Indian Institute of Oilseeds Research has developed a biopolymer seed coating that carries nutrients and helpful microbes, helping seedlings establish under drought and erratic rain.

Why it matters: Cheap, farm-level tools like this matter for rain-fed oilseed growers, who face the sharpest weather risk.

Read at DD News →

Built Environment & Cities 2

India

Cyberabad Civic Body Tenders ₹169 Crore Net-Zero Headquarters

Cyberabad Municipal Corporation has called e-tenders for twin towers of 2.4 lakh sq ft in Hyderabad, designed as a net-zero building and housing an integrated command centre.

Why it matters: Public buildings set the tone for local developers, and this brief gives Hyderabad architects a live net-zero project to watch.

Read at The Hindu →
India

Bombay High Court Wants Afforestation Before Project Clearances

The court told state agencies to plant trees and report survival rates before seeking clearances for urban projects, and asked for five years of green-cover data on a pod car corridor proposed on mangrove land.

Why it matters: Infrastructure planners in Maharashtra may now have to show compensatory planting works before work starts, not after.

Read at Bar and Bench →

Industry & Emissions 2

India

Suzlon Invests ₹200 Crore in 1 GW Blade Factory in Thoothukudi

Suzlon has begun work on a plant to make 95-metre blades for its S175 5 MW turbine, due to start within 12 months.

Why it matters: Local blade supply for larger turbines cuts import dependence just as Indian wind orders climb.

Read at Mercom India →
India

Attero Plans ₹3,000 Crore Critical Minerals and Recycling Expansion

Attero will spend ₹3,000 crore over five years, about ₹1,200 crore of it on lithium, nickel and cobalt processing, with new plants in Bengaluru and Andhra Pradesh.

Why it matters: Recovering battery metals at home reduces India's exposure to imported critical minerals for EVs and storage.

Read at PV Magazine India →

Finance & ESG 3

India

Moglix Launches Zero-Capex Rooftop Solar Financing for MSMEs

B2B platform Moglix has launched Moglix Solar, which installs rooftop systems with no upfront cost and recovers it through monthly instalments pitched below current power bills.

Why it matters: Upfront cost is the main barrier for small manufacturers; pay-as-you-save models could open an estimated 18 GW of MSME rooftop potential.

Read at Saur Energy →
International

IFC Anchors $232 Million Fund to Decarbonise Apparel Suppliers

The D-TAFS fund will finance energy efficiency and renewable upgrades at textile, apparel and footwear factories in emerging markets, where no single brand wants to pay alone.

Why it matters: Indian garment and textile exporters face rising emissions demands from global brands, and this is a new pool of capital to meet them.

Read at ImpactAlpha →
International

EU Auditors Find €5.4 Billion Gap in Green Bond Claims

The European Court of Auditors said the NextGenerationEU green bond framework cannot guarantee money goes only to green projects, and estimated sustainable spending claims were 9.8% too high.

Why it matters: India's sovereign green bond programme will face the same tracking questions, so its allocation reporting needs to be watertight.

Read at Eunews →

Summaries are written by Climatora for information only and are not legal, financial or investment advice. Original reporting belongs to the publishers linked in each story.

← Prev. Issue No newer issue →